Schedule integrated from notification
Milestones shared in your format. No improvisation — key dates are set before the first trowel stroke.
You manage the overall coordination. QUASART takes on the facade, EWI and fit-out packages — with the administrative rigour and responsiveness a general contractor is entitled to expect from its subcontractors.
Immediate
Annual certificate
Immediate
CCSS Luxembourg
Law 75 bond
VIES-verified LU number
Digital or paper format per your requirements
Request the full dossierA subcontractor who creates scheduling problems, who does not respond to site instructions, or whose admin documents are always pending — is a waste of time and money for you.
Milestones shared in your format. No improvisation — key dates are set before the first trowel stroke.
Every site instruction is acknowledged in writing. Any scope change results in a formal variation order.
Weekly or fortnightly progress report. Compatible with Procore, email, any format — you choose.
You send us your bill of quantities or specification. We read it in full — no blind pricing. Response with unit prices and detailed assumptions.
Detailed quotationSignature of subcontract compliant with the law of 31/12/1975. Immediate integration into the master schedule. Designation of a single QUASART contact.
Law 75 · Bond · Bank detailsExecution per specification. Reporting at your frequency. Variations managed in writing. Strict compliance with your site safety rules.
PPSPS · QSE planStructured as-built dossier, ready for your client handover. Defects resolved within contractual deadlines. Ten-year guarantee available.
Dossier · Ten-yearEach package can be subcontracted separately or combined according to your project organisation.
Timber, metal cassettes, HPL panel cladding. Frame and facing installation, junction and detailing treatment.
ETICS systems with thin-coat render. Rock wool or EPS insulation. Compliance with LU/FR thermal regulations.
Drylining, thermal and acoustic linings, suspended ceilings. Internal insulation of lofts and raking ceilings.
Installation on new or renovation substrates. Brick selection per architect specification. Neat joints.
Substrate assessment, high-pressure cleaning, crack treatment, localised repairs, finishing render. Compatible with occupied buildings.
Structured as-built dossier: as-built drawings, product data sheets, inspection reports, maintenance notices. Paper and digital format.
Standard contractual clause. Our deadlines are sized to hold, not to be renegotiated mid-project.
QUASART prepares its own PPSPS in compliance with the general coordination plan. QSE manager available on request.
The QUASART project manager designated at notification remains your contact until handover. Reachable promptly.
Formalised in the contract. The as-built dossier is delivered complete at handover, without chasing.
« Outstanding communication, no chasing required. We are working with them again on a second site. The difference with an ordinary subcontractor is that they understood what it means to work within our organisation, not alongside it. »
— Works director — General contractor, Greater Region
What our contacts systematically ask before adding us to their approved subcontractor list.
Yes, systematically. We read the specification in its entirety before pricing — including particular technical requirements and quality standards. Our quotation is detailed by item with assumptions clearly stated.
Compliant with the law of 31/12/1975 on subcontracting. The contract includes: client approval if required, bank bond or direct payment delegation, reciprocal penalty clause, price revision conditions.
You are alerted promptly as soon as the issue is detected — not at the weekly site meeting. We distinguish issues attributable to our package from delays caused by other trades. Everything is recorded in writing.
Yes. Luxembourg, France, Belgium and Germany. Intra-community VAT. For works in France, we manage posting declarations, URSSAF obligations and collective agreement compliance.
Every variation is subject to a prior written variation quotation, approved before execution. Variation prices are based on the unit prices of the original contract or by detailed breakdown if outside the schedule.
Yes, as joint venturer or declared subcontractor. We understand the requirements of Luxembourg and French public contracts (DC4, CCAG works approval, quality assurance plan). All our attestations are compatible.