Asset managers · Property managers · Letting agencies

You manage a portfolio. Not one more building site.

Facades, envelope works and make-ready refurbishments for building managers: quotes comparable from one asset to the next, one contact per portfolio, clean works in occupied buildings — and reporting you forward to the owner without rewriting it.

1
Contact per portfolio
100%
Forwardable photo reporting
Occupied
Works in occupied buildings
A → Z
Facade, commons and floors
A manager should never have to chase their contractor. Goal: dates, documents and amounts sent without being requested.
What we standardise for your portfolio

Documents you forward to the owner — without rewriting them.

01📋

Standardised quotes

Same structure from one building to the next — comparable in one reading

02🗂️

Per-building file

Works, warranties, condition — the history that remains

03📷

Photo reporting

Dated before/after, ready for the committee or the owner

04🗓️

Letting-driven schedule

Dates aligned with notice periods, inventories and re-lettings

05🏛️

Administrative file

Certificates, RCS extract, business permits — the complete vendor file

Standardised across the portfolio · Reusable formats · One single contact

Talk about your portfolio
What is at stake

Your value plays out between two inventories.

Managing buildings means answering for their value to owners who compare. The facade decides the asset’s value, the make-ready decides the vacancy — and the contractor decides your weeks.

01⏱️

The vacancy that eats the yield

Between two tenants, every week of works is a week of lost rent. A refurbishment that starts on date and ends on date transforms your vacancy rate — and your reporting to the owner.

02📉

The envelope that downgrades the asset

A tired facade: below-market rents, departing tenants, falling valuations — and growing ESG pressure from investors. Renovating the envelope is the most visible investment of any value plan.

03🔁

The contractor you have to manage

Chasing, incomparable quotes, works spilling over onto occupants: a contractor who needs managing is a hidden cost. We standardise quotes, reporting and contact — you manage your portfolio, not our teams.

Our method

From portfolio tour to portfolio memory.

Portfolio tour & priorities

Visit of the buildings concerned, condition of envelope and common areas, priorities built with you: what is urgent, what adds value, what can wait.

Portfolio view
Before works

Standardised quotes & planning

Same quote structure from one building to the next, visible quantities and unit prices, schedule aligned with the letting cycle — notice periods, inventories, re-lettings.

Comparable
During works

Works in occupied buildings

Protection, agreed hours, occupant communication validated by you, photo reporting at fixed intervals. Any discovery leads to a variation submitted BEFORE execution.

Occupants respected
Ongoing

One contact, one history

The same contact over time, one file per building, warranties tracked. Your portfolio gains a memory — and you gain time on every new operation.

Portfolio memory
Scope of work

What QUASART delivers across your portfolio.

From a single flat to a multi-building campaign — under one contact.

PACKAGE 01🏢

Facades & portfolio envelope

Restoration · Cladding · EWI

Renovating the facades that carry the asset’s value: restoration, ventilated cladding, external insulation — with the technical documents for whatever energy subsidies the building qualifies for.

RestorationEWIValue
PACKAGE 02🔑

Make-ready refurbishments

Between tenants · Agreed date

Drylining, skim coats, paints, minor repairs: the flat or floor made lettable fast and clean, with the agreed date as the goal — every day gained is a day of rent.

PaintReduced vacancy
PACKAGE 03🛗

Common areas

Lobbies · Stairwells · Circulations

Entrance halls, stairwells, circulations: the square metres every visitor, tenant and potential buyer walks through. Careful finishes, without blocking the building.

LobbiesOccupied site
PACKAGE 04🏬

Office floors

Offices · Partitions · Finishes

Partitions, ceilings, paints on office floors — fit-outs and refurbishments between leases, coordinated with your other trades.

PartitionsOffices
PACKAGE 05🌧️

Envelope maintenance

Waterproofing · Repairs · Claims

Waterproofing repairs, post-claim reinstatement in contact with the insurer, targeted interventions that prevent tomorrow’s major works.

WaterproofingInsurance
PACKAGE 06🤝

Multi-building campaigns

Several assets · Coordinated

Campaigns planned across several buildings, specialist partners integrated under our coordination: one contact for the whole portfolio, one schedule.

Multi-siteSingle contact
What you can put in the contract

What a manager is entitled to demand.

📋Quotes

Comparable from one building to the next

Same structure, same wording, visible quantities and unit prices: you compare, decide and justify your decisions to the owner in one reading.

🗓️Dates

Aligned with the letting cycle

A re-letting does not get postponed. Dates are agreed against your letting deadlines — notice periods, inventories — and tracked. A slip is announced, never discovered.

🧹Occupants

Occupied buildings treated as such

Protection, agreed hours, occupant communication validated by you: your tenants experience a controlled intervention — not a reason to terminate.

📷Reporting

Forwardable as-is to the owner

Dated before/after photos, per-building file, invoices matching quotes: your reporting builds itself, operation after operation.

“You recognise a good portfolio contractor by the fact that nobody talks about them anymore: buildings progress, occupants do not complain, reporting arrives. That is exactly the ambition.”

— QUASART — Execution philosophy
FAQ

The questions managers ask.

What asset managers, property managers and letting agencies ask us before entrusting a first building.

Do you work under framework agreements across several buildings?

Yes — that is precisely where our standardisation returns the most: same quote structures, same contact, same reporting formats across the portfolio. A framework agreement can start with one or two test buildings, then extend once trust is established, not before.

What lead times for a make-ready between two tenants?

The end date is agreed before the start, aligned with your re-letting — and we organise our work to keep it. We do not announce a standard number of days: a repainted studio and a re-partitioned office floor do not compare. What we put on the quote: an agreed end date.

How do you work in an occupied building?

Systematic protection, hours agreed with you, occupant information through your channel and in your tone — never wild notices in letterboxes. Goal: common areas usable and clean every evening — a tenant should never pay for your works with their peace.

Do you work with institutions as well as small agencies?

Yes, with the same mechanics: the standardisation that reassures an institutional asset manager saves the same time for a ten-building agency. The format of quotes, reporting and building files does not change — only the scale does.

Can you support an energy-subsidy application?

We provide all the technical documents: insulation characteristics, target performance, product sheets, installation certificates. The administrative assembly depends on the subsidy regime applicable to the building — we tell you honestly what is ours to do and what belongs to your advisor.

What are your registrations and area of operation?

Luxembourg company registered with the RCS under no. B253631, holding business permits (autorisations d’établissement) no. 10129974/1 to /5 (including peintre - plafonneur - façadier, i.e. painter, plasterer, facade installer). We work across the Grand Duchy first, as well as in Moselle, Meurthe-et-Moselle and the Belgian province of Luxembourg.

Your portfolio deserves a contractor who manages themselves.

Tell us about two or three buildings — we come back with a portfolio tour, argued priorities and comparable quotes.