Public procurement · Public buildings · Greater Region

Public-sector rigour, native in our DNA.

Public procurement, tenders, occupied buildings — QUASART is structured to meet the constraints of public-sector clients. Complete administrative dossier, documented QSE, PPSPS available.

Structured technical submission — delivered within tender deadlines
Complete administrative dossier provided on request
PPSPS, quality assurance plan and safety register available
Works in occupied buildings — public service preserved
Compliance with DTU, LU and FR standards, local requirements
Express
Admin dossier delivered
Prompt
Tender analysis feasibility
LU·FR·BE
Public procurement Greater Region
QSE
Active approach & documented
Send us the tender documents. We analyse feasibility and respond promptly — with a precise technical positioning.
Subcontractor dossier available

All documents required for a public contract.

01📋

Luxembourg commercial register extract

B253631 · Registered 16/04/2021

02🛡️

Ten-year insurance

Current annual certificate

03📄

Professional liability

Up-to-date liability insurance

04

Social attestations

MSS · CCSS Luxembourg · contributions

05🏦

Bank details

Luxembourg IBAN · Law 75 bond

06🇪🇺

Intra-community VAT

LU33087966 · VIES-verifiable

Provided on request. Digital or paper format. Continuously updated.

Request the full dossier
What is at stake

A non-compliant contractor puts your liability at risk.

In a public contract, every procurement decision is audited, every contractor is verifiable. QUASART is structured never to put you in default.

01⚖️

An incomplete dossier that jeopardises the award

In a public contract, a subcontractor with expired certificates or an incomplete dossier can invalidate your bid. QUASART provides its complete dossier on request, up to date, without chasing.

02🏛️

Works that disrupt public services

A school under construction that cannot operate, a town hall closed — every disruption to public services is a political and operational problem. QUASART plans by integrating operational constraints from the quotation stage.

03📊

Insufficient traceability in case of audit

Public contracts are subject to audits — Court of Auditors, inspections. Every expenditure must be justifiable, every service traceable. QUASART produces rigorous and verifiable documentation.

Tender response

From receiving the tender to delivering the technical submission.

Tender receipt & feasibility analysis

We read the specification, drawings and particular requirements. We analyse technical and financial feasibility and respond with a precise positioning.

Complete analysis
Within tender deadlines

Technical submission drafting

Structured technical submission: company presentation, relevant references, human and material resources, methodology, QSE approach, provisional schedule.

Complete submission
Simultaneous

Detailed pricing

Line-by-line pricing of the schedule of rates. Justified unit prices, options and variants if authorised. No unjustified lump-sum items.

Justified prices
In progress

Compliant works in occupied site

Public buildings often remain in use. QUASART organises works to minimise disruption — adapted hours, zoned areas, signage, controlled noise.

Occupied site
Scope of works

Packages compliant with public procurement requirements.

Each package can be separately awarded or combined as per the tender documents.

LOT 01🏠

A2-rated ventilated facades

Cladding / Overcladding

Fibre cement cladding (EQUITONE, Eternit), metal, StoVentec. Fire rating A2-s1,d0 compliant with public buildings. DTU 41.2 execution.

Fire A2DTU 41.2Public buildings
LOT 02🌡️

EWI & ETICS

Thermal insulation

ETICS or thick-render systems. A1-rated rock wool mandatory for public buildings. Compliance with Luxembourg GPE regulations.

ETICSRock woolGPE
LOT 03🪣

Interior fit-out

Partitions / Ceilings / Painting

Drylining, suspended ceilings, painting. Fireboard EI 90/EI 120 for fire-rated partitions.

FireboardEI 120DTU 25.41
LOT 04🔊

Acoustic insulation

Schools / Nurseries / Public buildings

Double-frame partitions Rw ≥ 50 dB. Rockfon acoustic ceilings. Compliance with Luxembourg acoustic regulations.

Rw ≥ 50 dBRockfonNF EN 12354
LOT 05🧱

Natural stone & terracotta

Facing / Heritage

A1-rated natural stone, Terreal/NBK terracotta. For heritage buildings and institutions. Non-combustible fire rating.

A1HeritageTerreal
LOT 06📋

As-built dossier & DIUO

Regulatory documentation

Complete as-built dossier, DIUO contribution, as-built drawings, maintenance data sheets. Format compliant with public client requirements.

DIUOAs-builtDrawings
Quality · Safety · Environment

Our QSE approach is managed at director level.

📋Quality

Quality assurance plan (QAP)

Documented procedures, in-progress inspections, intermediate handovers. Full traceability of materials and operatives. QAP provided for each contract.

⛑️Safety

PPSPS & safety register

PPSPS prepared in compliance with the general coordination plan. Safety register maintained on every site. PPE/CPE compliant. Documented safety training.

♻️Environment

Compliant waste management

Waste tracking notes. Priority choice of low environmental impact materials per contract requirements. Compliant with LU and FR regulations.

« Regulatory compliance is managed at director level. It is not a file stored in a drawer — it is a daily site practice, documented and verifiable at any time. »

Marèva Parache — Partner, HR & Legal Manager, QUASART S.à r.l.
They trust us

Our partners

FAQ

What a public-sector client always asks.

The questions that local authority technical departments systematically put to us.

Is QUASART qualified for Luxembourg public contracts?

Yes — Luxembourg commercial register B253631, AXA ten-year insurance, up-to-date tax and social attestations, references from completed public contracts (schools, nurseries, administrative buildings). Structured technical submission with dedicated organisational chart.

Which materials are compliant with fire ratings for public buildings?

Public buildings require A1 or A2-s1,d0 rated materials: fibre cement (EQUITONE, Eternit), terracotta (Terreal, NBK), natural stone, StoVentec, Rockwool rock wool. Timber and HPL are generally not compliant for public buildings.

Can work be carried out during school holidays only?

Yes — QUASART can concentrate noisy works during holidays and quiet works during school terms. The schedule is agreed with you before starting.

Is the PPSPS provided before starting?

Yes — systematically submitted to the SPS coordinator before the start of works. Specific to the site and incorporating risks identified during the preliminary visit.

Does QUASART provide the DIUO at the end of works?

Yes — DIUO contribution delivered with the as-built dossier at handover. As-built drawings, material maintenance data sheets, maintenance conditions, precautions for future interventions.

Are delay penalties accepted?

Yes — standard public contract conditions. Our schedule is sized with a safety margin to absorb common contingencies.

A public contract to award? Send us the tender documents.

Prompt feasibility analysis. Technical submission within tender deadlines. Complete administrative dossier.