An incomplete dossier that jeopardises the award
In a public contract, a subcontractor with expired certificates or an incomplete dossier can invalidate your bid. QUASART provides its complete dossier on request, up to date, without chasing.
Public procurement, tenders, occupied buildings — QUASART is structured to meet the constraints of public-sector clients. Complete administrative dossier, documented QSE, PPSPS available.
B253631 · Registered 16/04/2021
Current annual certificate
Up-to-date liability insurance
MSS · CCSS Luxembourg · contributions
Luxembourg IBAN · Law 75 bond
LU33087966 · VIES-verifiable
Provided on request. Digital or paper format. Continuously updated.
Request the full dossierIn a public contract, every procurement decision is audited, every contractor is verifiable. QUASART is structured never to put you in default.
In a public contract, a subcontractor with expired certificates or an incomplete dossier can invalidate your bid. QUASART provides its complete dossier on request, up to date, without chasing.
A school under construction that cannot operate, a town hall closed — every disruption to public services is a political and operational problem. QUASART plans by integrating operational constraints from the quotation stage.
Public contracts are subject to audits — Court of Auditors, inspections. Every expenditure must be justifiable, every service traceable. QUASART produces rigorous and verifiable documentation.
We read the specification, drawings and particular requirements. We analyse technical and financial feasibility and respond with a precise positioning.
Complete analysisStructured technical submission: company presentation, relevant references, human and material resources, methodology, QSE approach, provisional schedule.
Complete submissionLine-by-line pricing of the schedule of rates. Justified unit prices, options and variants if authorised. No unjustified lump-sum items.
Justified pricesPublic buildings often remain in use. QUASART organises works to minimise disruption — adapted hours, zoned areas, signage, controlled noise.
Occupied siteEach package can be separately awarded or combined as per the tender documents.
Fibre cement cladding (EQUITONE, Eternit), metal, StoVentec. Fire rating A2-s1,d0 compliant with public buildings. DTU 41.2 execution.
ETICS or thick-render systems. A1-rated rock wool mandatory for public buildings. Compliance with Luxembourg GPE regulations.
Drylining, suspended ceilings, painting. Fireboard EI 90/EI 120 for fire-rated partitions.
Double-frame partitions Rw ≥ 50 dB. Rockfon acoustic ceilings. Compliance with Luxembourg acoustic regulations.
A1-rated natural stone, Terreal/NBK terracotta. For heritage buildings and institutions. Non-combustible fire rating.
Complete as-built dossier, DIUO contribution, as-built drawings, maintenance data sheets. Format compliant with public client requirements.
Documented procedures, in-progress inspections, intermediate handovers. Full traceability of materials and operatives. QAP provided for each contract.
PPSPS prepared in compliance with the general coordination plan. Safety register maintained on every site. PPE/CPE compliant. Documented safety training.
Waste tracking notes. Priority choice of low environmental impact materials per contract requirements. Compliant with LU and FR regulations.
« Regulatory compliance is managed at director level. It is not a file stored in a drawer — it is a daily site practice, documented and verifiable at any time. »
— Marèva Parache — Partner, HR & Legal Manager, QUASART S.à r.l.
The questions that local authority technical departments systematically put to us.
Yes — Luxembourg commercial register B253631, AXA ten-year insurance, up-to-date tax and social attestations, references from completed public contracts (schools, nurseries, administrative buildings). Structured technical submission with dedicated organisational chart.
Public buildings require A1 or A2-s1,d0 rated materials: fibre cement (EQUITONE, Eternit), terracotta (Terreal, NBK), natural stone, StoVentec, Rockwool rock wool. Timber and HPL are generally not compliant for public buildings.
Yes — QUASART can concentrate noisy works during holidays and quiet works during school terms. The schedule is agreed with you before starting.
Yes — systematically submitted to the SPS coordinator before the start of works. Specific to the site and incorporating risks identified during the preliminary visit.
Yes — DIUO contribution delivered with the as-built dossier at handover. As-built drawings, material maintenance data sheets, maintenance conditions, precautions for future interventions.
Yes — standard public contract conditions. Our schedule is sized with a safety margin to absorb common contingencies.