Curved and fire-rated plasterboard partitions — PwC offices, Cloche d’Or, Luxembourg
Client
CBL
Architect
Moreno Architecture et Associés, A2M
Package
Drylining (partitions and linings)
Location
Cloche d’Or (Gasperich), Luxembourg City
Year
2026
Status
Work in progress
At Cloche d’Or, in the Gasperich district, Cloche d’Or Development is building an office campus for PwC Luxembourg that is targeting BREEAM Outstanding and WELL Platinum certification. For CBL, which forms the project’s general contracting joint venture with Galère and CLE, QUASART is carrying out the drylining for the interior fit-out of building B: partitions, wall linings, service shafts and fire protection, all in plasterboard.
The contract, signed on 2 September 2026, schedules installation from September to the end of October. By late October, the curved partitions are being jointed, and work is continuing.
The right board for each use
The package covers the full range of plasterboard work in an office building. The office partitions, with two layers of board on each face, are 100 or 130 mm thick. In the washrooms, partitions and wall linings use moisture-resistant boards, designed for wet areas.
Wherever fire safety requires it, the boards are fire-rated: partitions, the mezzanine lining, encasements for steel columns and beams, and the closing of service shafts. As an additional order, QUASART is also enclosing electrical cabinets: two fire-rated boards, top and bottom, on a frame of tracks and studs built around each cabinet.
Curved partitions
Several partitions in building B are curved: on the ground floor and on the third and fourth floors, rounded walls shape the spaces of the fit-out. Their metal framework follows the curve, with curved tracks at floor and ceiling and studs set closer together than in a straight partition.
The boards are then screwed on in several rows along the curve, and the joints are filled. In late October 2026, several curved partitions have reached this stage, ready for the finishing trades.
In step with the other trades
In an office fit-out, drylining clears the way for the other trades. In mid-September, the programme gave priority to the service shafts and washrooms: closing them first allowed the following contractors to move in without delay.
Progress is recorded each month in a valuation based on measured quantities. The valuation of 22 October 2026 lists more than 600 m² of partitions and wall linings installed, including 109 m² of fire-rated lining on the mezzanine, and nine electrical cabinets enclosed.
The work is also part of the campus’s environmental approach: QUASART’s contract incorporates the BREEAM and WELL requirements set by the design team, together with a low-carbon target.
The project in pictures







Questions about this project
What is drylining?
The construction of partitions, wall linings and ceilings by dry assembly: plasterboard screwed onto a metal framework, with no masonry to dry out.
What is the difference between standard, moisture-resistant and fire-rated boards?
Standard board is used for ordinary partitions. Moisture-resistant board, treated against damp, goes into washrooms and wet areas. Fire-rated board, with a reinforced core, improves the fire performance of the walls, shafts and structures it protects; on this site it can be recognised by its pink colour.
How is a curved plasterboard partition built?
On a framework that follows the curve: curved tracks at floor and ceiling, and studs set closer together than in a straight partition. The boards are then screwed on along the curve, and the joints are filled.
What do BREEAM Outstanding and WELL Platinum mean?
They are the highest levels of two building certifications: BREEAM assesses environmental performance, WELL the health and comfort of occupants. QUASART’s contract incorporates the requirements set by the design team so that the campus can achieve them.
Does QUASART work for general contractors?
Yes. On this campus, QUASART works as a subcontractor to CBL, a member of the general contracting joint venture it has formed with Galère and CLE. In Esch-sur-Alzette it is installing metal cladding for CLE in the Rout Lëns district, and at Belval it is painting a research building on the Space Campus for POECKES.