In the Rout Lëns district of Esch-sur-Alzette, block 14 brings together several residential buildings developed by IKO Real Estate. For the facade contractor HD Systems, QUASART lined the ground-floor soffit of building 30: insulation, substructure and aluminium composite panels.
From 14 September to 13 October 2026, QUASART installed the insulation on both zones assigned to it, 344.6 m² in total, then the substructure and panels on the second zone, covering 155.4 m². HD Systems supplied the materials and cut the panels to size in its own workshop; QUASART carried out the installation with its own tools.
A build-up installed layer by layer
Directly beneath the concrete slab comes the insulation: 120 mm Kingspan Kooltherm K21 phenolic foam boards, fixed with 152 mm screws fitted with metal washers — the round discs visible in the photos. For this thickness, the manufacturer states a thermal resistance of 5.70 m²·K/W.
Next come the substructure and the cladding. Gecko brackets, each fixed with two 10 × 120 mm screws, carry 89 × 35 mm black anodised aluminium rails, screwed on from the side. The 4 mm Albond panels — two 0.5 mm aluminium skins either side of a core, coated in RAL 9006 (white aluminium) — are fixed to the rails with colour-coated rivets.
Roles set out in the contract
The contract covered installation only. HD Systems supplied the insulation, brackets, rails, screws, rivets and mobile scaffold tower, and cut the panels in its workshop from measurements taken on site by its foreman and QUASART’s team leader. QUASART provided the labour and the tools: cordless screwdrivers, rivet guns, drills, a mitre saw and laser levels.
Payment was per square metre actually installed, based on a joint measurement. Before work began, QUASART had checked the areas of the two zones from the facade contractor’s drawings: 189.2 m² for the first, 155.4 m² for the second.
Working overhead
Everything is installed from a mobile scaffold tower, on a site where other trades are working at the same time. QUASART’s site-specific health and safety plan and its site access request had been drawn up by 10 September, before work began.
As the work progressed, the facade contractor asked for additional work outside the contract, carried out on a daywork basis: drilling the insulation washers, modifying the substructure, forming angle trims on site, and cutting and handling panels.
The finished soffit
By the end of October 2026, the soffit is complete: beneath the ground-floor arcade, the aluminium panels form a continuous ceiling in a light metallic grey, punctuated by the panel joints and the lines of rivets. The concrete columns pass through it, each ringed with light.
The project in pictures







Questions about this project
What is a soffit?
The underside of a building element, seen from below: here, the ceiling of the building’s ground floor. It is lined with the same systems as a facade: insulation, substructure and panels.
What is an aluminium composite panel?
A panel made of two aluminium skins either side of a core. Here, 4 mm Albond panels with 0.5 mm skins, coated in RAL 9006 and fixed to the rails with colour-coated rivets.
How well does the insulation perform?
For Kooltherm K21, Kingspan states a thermal conductivity of 0.021 W/(m·K) at this thickness, which gives a thermal resistance of 5.70 m²·K/W for the 120 mm installed here.
Why did the facade contractor supply the materials?
Because the contract covered installation only: HD Systems bought the materials and cut the panels in its workshop, while QUASART provided the labour and the tools. Payment was by the square metre actually installed.
Does QUASART also install metal cladding on facades?
Yes. In the same block at Rout Lëns, QUASART is installing the ArcelorMittal ST 300 steel board cladding on building 29B for the general contractor CLE.