Large-format Rockpanel ceiling panels — School in Howald
Client
Schnur Systeme s.à r.l.
Package
Rockpanel ceilings (daywork)
Location
Howald (Hesperange)
Year
2026
On a school construction site in Howald, the general contractor Schnur Systeme was looking for extra help: three fitters specialised in Rockpanel facades, to install large-format ceiling panels with concealed fixings. QUASART provided three of its cladding fitters on a daywork basis, from 11 to 13 May 2026.
The request arrived on Tuesday 5 May; that same evening, QUASART confirmed that three cladding fitters would be available from the following Monday.
The general contractor’s request
On 5 May 2026, Schnur Systeme asked QUASART for three fitters specialised in Rockpanel facades. From Monday 11 May, the job was to install Rockpanel boards with concealed clip fixing — mainly large-format panels on the ground-floor ceilings.
The panels are fitted overhead, and their size means four or five people are needed to hold them in place. On site, the general contractor’s facade site manager allocated the fitters and directed the installation.
A ceiling with concealed fixings
The photos taken on 7 May, four days before the work began, show the supporting structure: beneath the insulation fixed to the ceiling, a metal grid substructure on brackets receives the panels. The first panels, still in their protective film, were already in place.
With clip fixing, no fastener is visible from below: the clips are fixed to the back of the panel, which is then hung on the substructure. Only the panel surface and the joint pattern remain visible, which calls for careful installation, panel by panel.
Additional fitters on a daywork basis
On a daywork basis, QUASART supplies the labour while the general contractor keeps control of the site: materials, substructure and organisation remain in its hands. For a general contractor, it is a way to absorb a peak in workload without launching a new tender.
Three cladding fitters, three days, 72 hours. That same year, Schnur Systeme entrusted QUASART with two packages on a new residential building in Niederanven: the external wall insulation and the timber cladding.
The project in pictures





Questions about this project
What is a Rockpanel board?
A board made from compressed stone wool. It is used for facade cladding, and also to line soffits and ceilings, as at this school.
How does concealed clip fixing work?
Clips are fixed to the back of each panel, which is then hung on the substructure. No screws show on the visible face: only the panel surface and the joint pattern remain.
Why does a panel ceiling need several fitters?
Because the panels are installed overhead and are large-format. The general contractor had specified this in its request: four to five fitters were needed to hold them and put them in place.
What is daywork?
Work charged on the basis of time spent. QUASART provides tradespeople; the general contractor supplies the materials and directs the work. Here, three cladding fitters for three days, i.e. 72 hours.
Can QUASART support a general contractor on another site?
Yes: on a daywork basis for short-term support, as here, or as a subcontractor for a package, like the external wall insulation and timber cladding carried out for Schnur Systeme in Niederanven.