Large-volume commercial painting
Matt, satin or gloss paint for lobbies, circulation areas, conference rooms, hotel rooms. Teams with mobile elevating work platforms for great heights. Sikkens, Tollens, Caparol.
Large-volume painting, acoustic drylining, refurbishment of hotels and office towers — QUASART works in Kirchberg on office buildings, high-end hotels and institutional spaces. Head office in Crauthem, L-3327.
Kirchberg is Luxembourg’s most strategic business district. Concentrated between Avenue J.F. Kennedy and Parc Kirchberg, it is home to the European institutions (Parliament, Court of Justice, EIB), landmark office towers built between 1990 and 2010 and leading hotels — Sofitel Europe, Hilton, Hotel Parc Belle-Vue. These buildings are now entering a natural refresh cycle: commercial paintwork to redo, ceilings to renovate, reception areas and guest rooms to bring back up to international standards.
QUASART works in this market with an approach dedicated to commercial buildings: teams trained to work in occupied or partly occupied premises, compliance with security rules (badge access, out-of-hours work, restricted storage areas), scheduling coordinated with facility managers and property managers. The Philharmonie, the Coque sports centre and Forum Kirchberg also generate occasional needs for repainting large surfaces (foyers, technical dressing rooms, circulation areas).
Commercial renovation in Kirchberg involves very specific scheduling constraints: most projects take place out of hours (evenings 6pm-11pm or nights 10pm-6am, more rarely full weekends) to avoid any disruption to the tenant’s business. QUASART organises its teams around these hours — output maintained, quality preserved, full cleaning and handover of operational spaces every morning before 7am. Quick-drying paints and low-VOC coatings are preferred so that the premises can be used again immediately.
Based in Crauthem (L-3327), about 20 minutes from Kirchberg via the A1 motorway, QUASART is ideally placed to respond quickly — including emergency work after incidents (water damage, reinstatement after a tenant moves out). Our proximity to the European district is a decisive advantage for property managers who manage several assets in Kirchberg.
Matt, satin or gloss paint for lobbies, circulation areas, conference rooms, hotel rooms. Teams with mobile elevating work platforms for great heights. Sikkens, Tollens, Caparol.
Acoustic partitions and linings in 12.5 mm acoustic plasterboard (BA13) for meeting rooms, hotel rooms, focus booths. Sound insulation between commercial units.
Full skim coating, high-quality smooth skim coat for prestige spaces, hotel lobbies, executive lounges. A perfectly smooth finish before gloss paint.
Full coordination of the finishing trades for office floors, hotel wings, institutional floor plates. One point of contact, one schedule, structured invoicing.
Financial aid programmes exist in Luxembourg for insulation and energy renovation works. The Klimabonus programme may cover part of your investment, subject to eligibility criteria in force. Visit klima-agence.lu to check your situation. QUASART is not Klimabonus-certified and does not file grant applications on behalf of the client.
klima-agence.lu →Yes. QUASART can take on the renovation of entire office floors in Kirchberg — painting of walls and ceilings, skim coat repairs, replacement or modification of 12.5 mm plasterboard (BA13) partitions, suspended ceilings. Our teams follow the towers’ access protocols (badges, authorised hours, goods lifts) and work in coordination with facility managers to limit disruption on adjacent occupied floors.
Yes. QUASART can carry out hotel renovation in Kirchberg — rooms in successive waves to maintain occupancy, corridors, reception halls, breakfast rooms, conference rooms. We respect operational constraints: quiet works during sensitive hours, daily cleaning, protection of adjacent guest areas.
Yes. For conference rooms and meeting spaces in Kirchberg, we install partitions with 12.5 mm acoustic plasterboard (BA13) (such as Knauf Diamant or Gyproc Habito Silent), 70-100 mm mineral wool acoustic linings and suspended ceilings with sound-absorbing mineral tiles (Rockfon Blanka, Armstrong Ultima+). The sound reduction index Rw can reach 50-55 dB between two rooms, depending on the configuration.
QUASART adapts its working hours to the site constraints: standard days of 7am-5pm for work in empty areas, out-of-hours work (evenings, nights, weekends) for occupied offices or hotels in operation. We draw up a detailed schedule with the property manager or facility manager before starting, including the authorised time slots, goods lift access and material storage areas.
Yes. QUASART can work directly with the property managers and asset managers in Kirchberg — work on common areas, end-of-lease reinstatement after a tenant moves out (dilapidations works). Structured invoicing, full traceability of the works.
Every project is studied personally by our team. Depending on the floor area (typically 400 to 1,500 m² per floor), the scope of the works (painting only, drylining plus painting, complete reconfiguration of partitions) and the access constraints, QUASART provides a precise schedule with the quote. Simple floors move quickly; renovations involving a new partition layout take longer and require close coordination with the electrical and HVAC trades.